Roadwork and Construction

Find information about major roadwork, construction, park upgrades, and development projects that may impact traffic, trails, or access to public spaces in Port Moody. Project timelines are weather-dependent, and dates and times are subject to change.

Red City Engineering Projects    Map Purple  Development/Commercial

Click the + button on the map to zoom in or view a full size map here.

Roadwork and construction

These are roadwork and construction projects currently underway in Port Moody. The City oversees or coordinates this work, which may affect traffic in the area.

When: January 5 to February 6, 2026 (weather permitting)

Hours:

Eastbound: Between 7am and 3pm, traffic will be reduced to one lane. Vehicles will merge into the left lane.

Westbound: Between 9am and 7pm:

  • The bike lane will be closed.
  • The right-turn slip lane to Reed Point Way will also be closed.
  • A temporary cyclist pathway will be setup.

Impact to you: Expect traffic delays during these periods. Cyclists should use the temporary pathway provided. Drivers should plan for lane reductions and restricted turns.

When: January 19 to February 28, 2026
Where:
Bedwell Bay Road and First Avenue, between Thermal Plant Road and Ioco Road
Work hours: 9am to 3pm
Impact to you:
Single lane alternating traffic at various locations along 2.4km section of Bedwell Bay Road/First Avenue. Traffic control personnel will be on-site to support with traffic. Driveway access and bike lanes will be maintained.

Location 1: Dewdney Trunk Road at Viewmount Drive
When: December 1, 2025 to February 28, 2026
Work hours: 7:30am to 3:30pm
Impact to you:
Closure of the north parking lane on Dewdney Trunk Road, east of Viewmount Drive throughout construction. Work period includes 3-day closure (Dec.16-18) of the north segment of Viewmount Drive.

Location 2: Guildford Way at Carlsen Place
When: Februray 9 to April 10, 2026
Work hours: 7:30am to 3:30pm
Impact to you:
Closure of eastbound right lane and bike lane on Guildford Way at Carlsen Place/Eagle Ridge Hospital Main Entrance throughout construction. Cyclists to take the lane. After work hours, bike lane will be reopened. South sidewalk closed throughout construction. Pedestrians will be detoured to cross to north sidewalk at Falcon Drive and at Ungless Way. Expect traffic delays. 

When: February 3-6, 2026
Where: 2604, 2606, and 2610 St. George Street
Work hours: 7am to 7pm
Impact to you: Partial closure of parking lane on north side of St. George Street, east of Mary Street. Two-way traffic to be maintained. Traffic control persons will be on site to assist motorists, cyclists, and pedestrians as needed. 

When: January 30, 2026
Location: St. John’s Street eastbound, between Buller Street and James Road
Work hours: 9am to 3pm
Impact to you: Right lane closure on eastbound St. Johns Street. Parking will be restricted. Sidewalk to remain open. Bus Stop ID 53149 will be closed during the work. Traffic control persons will be on site to assist cyclists and pedestrians. 

Park and trail construction

These are park and trail construction projects currently taking place in Port Moody. They may result in temporary closures or limited access to certain areas.

The Hett Creek Trail bridge was heavily damaged during the November 2024 windstorm and, following an engineering assessment, the bridge remains closed. Trail users can detour via Wilkes Creek Trail. In addition to providing a pedestrian pathway, this bridge also supports a sewer pipe attached underneath. The City has hired a structural engineering firm experienced in bridge construction and stabilization to design the repairs. The design work is now more than halfway complete.

Construction is now expected to begin in August 2026, when work in the creek area is permitted and conditions are suitable for protecting fish and wildlife. View a map of the detour at portmoody.ca/trails

Construction on the new community fieldhouse is moving forward with completion anticipated for summer 2027. Please note the following impacts to the parking lot during construction:

Parking changes: Fencing will be installed around the project area which will block access to the mid‑section parking stalls. Vehicles will be able to enter the parking lot from both the east and west entrances, but travel through the work area will not be possible. Parking stalls will be designated for turnaround spaces. Please note that manoeuvring space will be tight.

EV chargers: Three out of nine EV chargers will remain available while the other six will be out of service. The three chargers will be available for use 24 hours a day, seven days a week.

Development

These are development projects led by private developers in Port Moody. They may cause traffic impacts or restricted access at certain times during construction.

Developer: Chroma 
Impact to you: Two-way traffic will be maintained in each direction on Buller Street. Traffic delays are expected.

Developer: Dema Developments
Impact to you: Hugh Street will be fully closed between St. John’s Street and St. Andrews Street for underground utility work. Eastbound traffic on St. John’s Street will merge into the left lane to accommodate the construction zone. As work progresses from the intersection toward the development site, sections of St. Andrews Street will close, with driveway access maintained for residents. Parking restrictions will also be in place on St. George Street to support construction activities in front of the development. Expect traffic delays throughout the area.

Developer: Wesgroup Properties
Impact to you: For power conduit installation work, there will be a parking lane closure on east side of Balmoral Drive between Carlsen Place and Highland Way. Two-way traffic to be maintained through lane shift around work area and the sidewalk will remain open.

When: January 19-30, 2026
Developer:
 Edgar Development Corp. 
Work: Multi-family Construction - Excavation - Phases 1,2,3
Location: Phase 1 - 296 Angela Drive, Phase 2 - 1209 Cecile Drive and Phase 3 - 1218 Cecile Drive  
Impact to you: Street parking will be restricted, and traffic will be reduced to single‑lane alternating, causing expected delays. Driveway access will be maintained. CMBC will be notified of possible impacts to Route 180 stops. Traffic control personnel will assist all road users.

When: January 26-30, 2026 
Developer:
PCI Developments Corp.
Location: 3006 Spring Street
Impact to you: Parking restrictions and HOV lane closure on St. Johns Street during work hours to install storm bypass. Sidewalk will be closed with a pedestrian pathway around the closure. The east driveway of 3034 St. Johns Street will be closed for one day during this period and will be reopened after work hours. Access to businesses will be maintained and supported by traffic control personnel. Temporary no parking signs will be instated on St. Johns Street westbound, west of Electronic Avenue. Traffic control persons will be on site to assist motorists, cyclists, and pedestrians.

Developer: Anthem Properties Group Ltd.
When: January 30 to March 31, 2026
Location: 110 James Road
Impact to you: Trucks will be travelling southbound on James Road and turning around to load next to site. Parking is restricted on James Road, and the east sidewalk will be closed at the site frontage. Driveway access will be maintained. Traffic control persons will be on site to assist cyclists and pedestrians as required.

Developer: Benedet Properties (St. Johns) Ltd. 
Location: 2334 St. Andrews Street
Impact to you: Intermittent parking restrictions on St. Andrews and Queen Street. 

Contact Us

Engineering
100 Newport Drive
Port Moody, B.C.
V3H 5C3
Email
Map this location