When: September 8 to November 20, 2026
Work hours: 7am to 7pm
Location: 100 Capilano Road
Impact to you: Street parking restrictions will be in effect in front of 100 Capilano Road during the work. The parking lane will be reopened after work hours. A pedestrian hoarding structure will be installed over the sidewalk to protect the public.
Roadwork and Construction
Find information about major roadwork, construction, park upgrades, and development projects that may impact traffic, trails, or access to public spaces in Port Moody. Project timelines are weather-dependent, and dates and times are subject to change.
Click the + button on the map to zoom in or view a full size map here.
City projects
Parks and trail construction
Development
Water main flushing
Roadwork and construction
These are roadwork and construction projects currently underway in Port Moody. The City oversees or coordinates this work, which may affect traffic in the area.
Capilano Road - Roof replacement
Metro Vancouver will be installing a new water main on Dewdney Trunk Road in Coquitlam. As part of this work, Dewdney Trunk Road will be fully closed between Pier Drive and Cawthra Court for approximately four months beginning on Tuesday, October 6, 2026.
When: Starting on October 6, 2026 for approximately four months
Work hours: Monday to Friday, 7am to 8pm and Saturday, 8am to 7pm
Location: Dewdney Trunk Road between Pier Drive and Cawthra Court, Coquitlam
Impact to you: Dewdney Trunk Road will be closed to vehicle traffic 24 hours a day, 7 days a week between Pier Drive and Cawthra Court. A detour route will be in place via Barnet Highway and Mariner Way. Pedestrian access will be maintained via Dolphin Street and Mariner Way. Please allow extra travel time and follow all posted signage.
Questions? Contact Metro Vancouver's Information Centre at 604-432-6200 or icentre@metrovancouver.org
For more information and to view a map of the work area, visit Metro Vancouver's Dewdney Trunk Road Water Main project webpage.
Glenayre Drive - Sanitary sewer rehabilitation project
When: August 3 to mid-December 2026
Work hours: 7am to 7pm
Location: Glenayre local roads; Glencoe Drive, Ailsa Avenue, Dundonald Drive
Impact to you: Single lane alternating traffic and parking lane closures will be in effect around the work areas, and sidewalk and pathway closures may be in effect. Street parking restrictions will be in effect to accommodate the work areas. Expect traffic delays on main roads. Traffic control personnel will be on site to assist motorists, cyclists, and pedestrians.
Henry Street - Underground utility installations
When: September 22 to December 17, 2026
Work hours: 7am to 7pm
Location: 3330-3340 Henry Street
Impact to you: Single lane alternating traffic and parking restrictions on Henry Street. Traffic control persons will be on site to assist motorists, cyclists, and pedestrians.
Ioco Road - Ioco cleansing station upgrades
When: September 1 to the end of November 2026
Work hours: 7am to 7pm
Location: 1850 Ioco Road
Impact to you: Traffic will be reduced to single lane alternating at the work area, and parking restrictions will be in effect. Traffic control persons will be on site to assist motorists, cyclists, and pedestrians.
Klahanie Drive - Sidewalk replacement
When: September 28 to November 20, 2026
Work hours: 7am to 7pm
Location: Klahanie Drive
Impact: Street parking restrictions will be in place on Klahanie Drive and Nootka Way. Nootka Way will be closed, with local traffic permitted. Single-lane alternating traffic on Klahanie Drive, between Murray Street and Nootka Way, and Nootka Way and 500 Klahanie Drive. Pedestrians will be directed to cross to the open sidewalk. Residents and pedestrian access will be supported and managed by traffic control personnel. Traffic control persons will be on site to assist motorists, cyclists, and pedestrians.
Moray Street - Construction for traffic calming measures
When: June 1 to January, 2027
Location: Between St. Johns Street and Brookmount Drive
Impact to you: The remainder of the work includes third-party utility work and signage upgrades. For more information on this project visit portmoody.ca/moray
Newport Drive - Christmas decoration installation
When: November 24, 2026
Work hours: 9am to 3pm
Location: 205 Newport Drive
Impact to you: Closure of the curb lane on eastbound Newport Drive and northbound Ioco Road adjacent to 205 Newport Drive to install overhead Christmas decorations. CMBC Bus Stop ID 53282 will be open during the work.
Ravine Drive - Bus stop improvement
When: November 12-20, 2026
Work hours: 7am to 7pm
Location: Turner Creek Drive and Ravine Drive
Impact to you: CMBC bus stop ID 58907 on southbound Turner Creek Drive at Ravine Drive will be impacted during the bus stop improvement work. The southbound bike lane on Turner Creek Drive will be temporarily closed, and cyclists will be directed to take the lane. Pedestrian access will remain available, and vehicle traffic will be shifted around the work area.
St. George Street - Staircase replacement
When: November 18 to December 10, 2026
Work hours: 7am to 7pm
Location: 2002 St. George Street
Impact: The staircase connecting the 2000 block of St. George Street to Port Moody Secondary School will be closed during reconstruction. No driveway impacts. Parking on St. George Street around the work area may be temporarily restricted, with notices provided a minimum of 72 hours prior to the work.
Park and trail construction
These are park and trail construction projects currently taking place in Port Moody. They may result in temporary closures or limited access to certain areas.
Art Wilkinson - Temporary closure of swing area, Late-October to late-November 2026
The swing area at Art Wilkinson Park will be temporarily closed while crews upgrade the swings and surfacing. Work includes replacing the existing belt swing and bucket swing, adding a new flex swing, and installing a new rubberized surface beneath the swing structure. All other playground features will remain open during the work. Thank you for your patience as we complete these improvements. For more information about City parks, visit portmoody.ca/parks.
Inlet Park Community Fieldhouse - January 2026 to early Fall 2027
Construction on the new community fieldhouse is moving forward with completion anticipated for early Fall 2027. Please note the following impacts to the parking lot during construction:
Parking changes: Fencing will be installed around the project area which will block access to the mid‑section parking stalls. Vehicles will be able to enter the parking lot from both the east and west entrances, but travel through the work area will not be possible. Parking stalls will be designated for turnaround spaces. Please note that manoeuvring space will be tight.
EV chargers: Three out of nine EV chargers will remain available while the other six will be out of service. The three chargers will be available for use 24 hours a day, seven days a week.
For more information on this project visit Inlet Park Redevelopment Project
Old Mill Park viewing platform repairs – November 16 to mid-December 2026
Repairs to the viewing platform at Old Mill Park, located along the Shoreline Trail between Rocky Point Park and Old Orchard Park, will begin on November 16, 2026. This work will help maintain the safety and long-term usability of the viewing platform for park visitors. All work is expected to be complete by mid-December 2026. Visitors may experience minor disruptions in the area during construction. To learn more about our parks, visit www.portmoody.ca/parks
Development
These are development projects led by private developers in Port Moody. They may cause traffic impacts or restricted access at certain times during construction.
BOSA Foods (St. Johns St.) - 2334 St. Andrews Street
Developer: Benedet Properties (St. Johns) Ltd.
Location: 2334 St. Andrews Street
Impact to you: From 7am-3pm, eastbound traffic will be reduced to one lane on St. Johns Street. Between 7am-7pm, Queens Street and St. Andrews Street will be closed to local traffic only. Business access on Queens Street will be temporarily closed, with drivers directed to use the alternate access on St. Johns Street during the closure. Access to residential driveways within closure areas will be maintained. The multi-use path will be maintained, and traffic control persons will be on site to assist motorists, cyclists, and pedestrians.
Inlet District - Ongoing construction activities
Developer: Wesgroup Properties
Concrete pours and deliveries
When: November 23, 2026 (9am to 3pm)
Location: Ioco Road northbound, between Barnet Highway and Suter Brook Way
Impact to you: Traffic will be reduced to one lane northbound between Windsor Drive and Suter Brook Way to accommodate a staging area for concrete trucks. Cyclists to take the lane. Driveway and business access will be maintained. The sidewalk will remain open during the work with overhead protection installed. Traffic delays are expected.
When: Now until November 27, 2026 (7am to 3pm)
Location: Ioco Road northbound, between Suter Brook Way and Guildford Way
Impact to you: The bike lane and right lane on northbound Ioco Road and the east sidewalk on Ioco Road between Barnet Highway and Suter Brook Way will be intermittently closed during scheduled concrete pours. A temporary bike pathway will be created next to the work area. The Inlet Centre Station @ Bay 2 bus stop (Stop ID 61988) may be closed during the work. Transit riders will be redirected to the nearest open stop. The crosswalk at Suter Brook Way and Ioco Road will remain open during both closures. Driveway and business access will be maintained. Traffic delays are expected. Traffic control persons to be on site to assist cyclists and pedestrians.
Material hauling and deliveries
When: June 8 to December 31, 2026
Location: 161 Ioco Road
Impact to you: Parking lane closure on east side of Balmoral Drive between Guildford Way and Guildford Drive. Trucks to enter and exit site through Balmoral Drive. Sidewalks to remain open. Traffic control persons will be on site at entrance and exit points and driveways to support with truck movements and traffic management.
Developer: Anthem Properties Group Ltd.
Impact to you: Intermittent instances of single-lane alternating traffic on Moray Street, between Golden Spike Lane and St. Johns Street. Traffic control personnel will be on site to assist pedestrians, cyclists, and vehicles. Driveway and business access will be maintained.
Developer: Edgar Development Corp.
When: April 6 to December 31, 2026
Work: Multi-family Construction - Phases 1,2
Impact to you: Intermittent single lane alternating traffic along Angela Drive between Glenayre Drive and Cecile Drive, and on Cecile Drive north of Angela Drive. Parking will be restricted in the work areas. Driveway access will be maintained. Pedestrian detours in place around work areas, including the construction of a temporary crosswalk on Cecile Drive south of Angela Drive. Traffic control persons will be on site to assist motorists, cyclists, and pedestrians. Expect traffic delays.
Tri-Cities Rental Project - 110 James Road
Developer: Anthem Properties Group Ltd.
Location: 110 James Road
Storm utility installation
November 10 to December 8, 2026: St. Johns Street eastbound between Buller Street and James Road will be reduced to a single lane during work hours. On-street parking within the work area will be temporarily restricted, and about 30 metres of parking will be unavailable overnight to allow for construction material staging. The bus stop on eastbound St. Johns Street at Buller Street will be temporarily relocated approximately 150 metres east. Expect traffic delays. Traffic control personnel will assist pedestrians safely through the work area.
Construction of multi-use complex
Now until December 31, 2026: From 7am to 7pm, single lane alternating traffic on James Road. Street parking will be restricted along James Road to accommodate staging and turnarounds of concrete trucks. The east sidewalk on James Road will be temporary closed during the work, with traffic control persons assisting pedestrians across James Road. Traffic control persons will be onsite to assist motorists, cyclists, and pedestrians.
Moody Centre - Water main flushing
When: Water main flushing will begin on Monday, October 19, 2026, and is expected to take approximately six weeks to complete.
Location: The work will take place in the Moody Centre neighbourhood.
Impact to you: You may experience temporary water discoloration, pressure fluctuations, or sediment in your water while flushing is underway. If this occurs, run cold water through a bathtub or other large fixture until the water clears. These conditions are temporary and do not pose a health risk. For more information, call Operations at 604.469.4574. The City is carrying out this work to maintain a high level of water quality in the distribution system.